656faff4 Клининг: https://skifcleaning.com



Hyundai Getz>> Engine>> General sequence of dismantling of the engine
1. It is most easier to assort the engine and to carry out all types of works at the figurative stand. Before engine removal at the stand it is necessary to remove a flywheel and a casing of coupling with a conducted disk.
2. If the stand is not present, to assort the engine it is possible, having strengthened it on a strong workbench or a floor. When dismantling engine without the stand it is necessary to observe extra care.
3. If it is supposed to hand over the engine in repair, at first it is necessary to remove all hinged units and the equipment to establish them subsequently precisely in the same order, as well as at independent major maintenance.
The following belongs to such units:
— generator and arms of its fastening;
— elements of system of decrease in toxicity of the fulfilled gases;
— distributor of ignition, candle and high-voltage wires of system of ignition;
— the thermostat with the case;
— the pump of cooling liquid;
— power supply system elements;
— inlet and final collectors;
— oil filter;
— fuel pump;
— elements of a suspension bracket (support) of the engine;
— a flywheel with a casing of coupling and a conducted disk.

       NOTE
At removal from the engine of hinged units especially show consideration for those details which can be necessary at removal of the engine or for auxiliary installation. Put labels on laying, epiploons, pro-rates, shaft, washers, nuts and other details to establish them in former situation.

4. If the block of cylinders of an incomplete complete set, that is the block of cylinders with established by the krivoshipno-shatunny mechanism and piston group is established, it is necessary to remove also a head of the block of cylinders, the oil pallet and the oil pump. The list of details subject to removal is defined by the accepted option of repair.
5. If it is planned to carry out complete major maintenance, the engine it is necessary to disassemble and remove completely its details in the following order:
— covers of a gear belt of a camshaft;
— gear belt;
— cover of a head of the block of cylinders;
— forward and back covers of the engine;
— head of the block of cylinders and camshaft;
— oil pallet;
— oil pump;
— shatunno-piston group;
— cranked shaft.
6. Before dismantling and performance of procedures of major maintenance the following tools and the equipment will be necessary:
— standard set of the tool;
— small plastic cash desks or plastic sacks for storage of details;
— a shpatel or a shaber for removal of the remains of laying;
— development for processing of openings;
— shock stripper;
— micrometer;
— the strelochny indicator with assembly elements;
— the adaptation for compression of springs;
— the adaptation for a honingovaniye of cylinders;
— the tool for cleaning of flutes for rings in pistons;
— electric drill;
— set of taps and dies;
— wire brushes (rigid and soft);
— solvent.